Community Assessments at Work

The following photographs are work that has been done on the Roads, Trails and Bridges from the assessments paid by Community Residents.

End of Conference Drive Fence

End of Conference Drive Fence

 

End of Conference Drive Fence

End of Conference Drive Fence

 

Ferndell Walking Bridge

Ferndell Creek Walking Bridge

 

Ferndell Creek Walking Bridge

Ferndell Creek Walking Bridge

 

New Paving.Ridgeway

New Paving.Ridgeway

 

New Paving.Pine-Madrone

New Paving.Pine-Madrone

 

F

Conference Center pool stairs repaired

 

IMG_0183

Abandoned or illegally parked vehicle abatement

 

IMG_2665

New speed bumps on Conference Drive

 

IMG_2666

Roadway and berm repair at Forest Rd. and Prospect Ave.

 

IMG_2669

Bridge that was damaged by a fallen tree, repaired on Tan Oak Trail

 

IMG_2676

New road signs

 

IMG_2678

Bridge decking replacement on Sequoia Trail

 

IMG_2683

New railroad tie stairs on Sequoia Trail where there was a major
landslide

 

IMG_2702

Examples of culverts and drainage ditches that require continual
maintenance and cleaning

 

IMG_2705

Examples of culverts and drainage ditches that require continual
maintenance and cleaning

 

IMG_2706

Examples of culverts and drainage ditches that require continual
maintenance and cleaning

 

IMG_2772

Bridge damaged by tree on Sequoia Trail

 

IMG_3294

Bridge repair done on Sequoia Trail

 

IMG_4963

Road Repairs being done by Mount Hermon’s Facilities Crew

 

IMG_5611

Bridge decking and support replacement on Sequoia Trail

IMG_5612

Completed bridge repairs on Sequoia Trail

 

IMG_5750

New retaining wall on Canyon Road